Highlights
Strike Drilling have been engaged and mobilised to site to undertake the Phase 2 exploration program at the Company’s Morrissey Hill Lithium Project, Yinnetharra WA
The Phase 2 drilling campaign is anticipated to consist of up to 9,000m of RC drilling
Phase 2 drilling will follow the plunge of the mineralisation at the Bonzer Prospect and test at least six other undrilled pegmatite targets
Morrissey Hill is located adjacent to Delta Lithium’s (ASX: DLI) Malinda Lithium Project, Yinnetharra WA
Reach Resources Limited (ASX: RR1 & RR1O) (“Reach” or “the Company”) is pleased to advise that Strike Drilling have today mobilised for commencement of the Phase 2 drilling program at the Company’s 100% owned Morrissey Hill Lithium Project.
Commenting on the results CEO Jeremy Bower said: “We see the initial drill program at Bonzer as a first step towards success at Morrisey Hill. The initial results have provided us with the encouragement to double our drilling metres in Phase 2 of the drilling program. We are a data driven team and we will work through this process methodically, with rigour and technical discipline. The data we have from exploration at Morrisey to date supports our contention that the project holds the potential to host high grade lithium, just like the Delta discovery next door. The Future is within Reach.”